In the case of the contactors, the ratio of the service period to the entire period is known as

In the case of the contactors, the ratio of the service period to the entire period is known as

Right Answer is:

Class of the contacts

SOLUTION

In the case of the contactors, the ratio of the service period to the entire period is known as the Load factor.

Intermittent duty is characterized by the value of the current, the duration of the current flow, and by the on-load factor which is the ratio of the in-service period to the entire period, often expressed as a percentage.

Scroll to Top